Construction starts
Construction gets underway on the three home project.
Here are the footings for Cameron Residence, the first of
the three homes to be built on the one property. The
old school that had been on the site for fourty years had
been demolished and removed during the previous month.
|
| |
|
|
|
Cameron - well underway
This is a view of Cameron Residence over the top of the
foundation and first floor platform of Dr. Mark Siegel
Residence.
|
| |
|
|
|
Nearing completion
This photo was taken from a position about twenty steps to
the right of the above photograph and about four months
later. All three homes are nearing completion, the
interior courtyard seems to be mostly complete except for
tree planters and the iron gates are being installed.
No landscaping has been done on the outer grounds at this
point.
|
| |
|
|
|
Fire Suppression System
This is the fire suppression system installed in our St.
Catherine residence. Cameron and Siegel each have one
of these monstrosities as well as each of the homes in our
Pickering program.
|
| |
|
|
|
Opening Day
Grand Opening. Speeches by the Mayor of Peterborough
and by The Big Cheese himself along with a good lunch and a
sunny day got our new programs opened successfully.
This opening was held in the spring of 2004 by which time
all twenty-four beds were full and the three programs in
full operation.
|